[1]
M. B. Tanaga and R. S. Oetama, “Material Requirement Planning Information System: Prototype And Lead Time Analysis”, journalisi, vol. 5, no. 3, pp. 848–859, Aug. 2023, doi: 10.51519/journalisi.v5i3.535.